At first, the Jai Hind metro station was prepared to become elevated. However, the AAI objected that the elevated stretch up to your airport might pose a danger to aircraft, Hence the route was additional reworked and the station was shifted underground, 150 m with the Airport terminal building. They are https://railwaykolkata62605.livebloggs.com/39816334/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf