At first, the Jai Hind metro station was planned to generally be elevated. Nonetheless, the AAI objected the elevated extend up on the airport may pose a danger to aircraft, so the route was further more reworked and the station was shifted underground, 150 m with the Airport terminal creating. https://deanujwju.blogadvize.com/39274582/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf